Guardrail production is open and transparent, and the customer is God’s implementation!

6 days ago

PRFrothing progress visual chart

According to the latest quality management trends in 2025, we use intelligent production progress tracking System3 to monitor order status in real time:

 

1. Design verification stage

Confirm all technical parameters of product drawings with customersPreview the installation effect through a 3D simulation system to avoid the risk of early design.

2. Raw material testing

Zinc Coating Test: Galvanizing is measured using an X-ray thickness meter. Tension strength test: 5000N tensile test of the sample. Second inspection of raw materials to achieve size, thickness, etc.

Semi-finished product sampling

After semi-production of the product, columns and mesh are produced, the inspector randomly sampled and tested in Jinyang to check the specifications, data, etc. of the semi-finished product. Ensure that the data of semi-finished products is normal.

Semi-finished trial device

Modular pre-assemblies in factory test areas

Check connector matching and overall structural stability

 Final inspection of finished products

100% appearance inspection: surface finish, welding point quality

Functional test: Simulate durability in harsh environments

Check external dimensions, appearance, finishing surface treatments, etc.

 