PRFrothing progress visual chart
According to the latest quality management trends in 2025, we use intelligent production progress tracking System3 to monitor order status in real time:
1. Design verification stage
Confirm all technical parameters of product drawings with customersPreview the installation effect through a 3D simulation system to avoid the risk of early design.
2. Raw material testing
Zinc Coating Test: Galvanizing is measured using an X-ray thickness meter. Tension strength test: 5000N tensile test of the sample. Second inspection of raw materials to achieve size, thickness, etc.
Semi-finished product sampling
After semi-production of the product, columns and mesh are produced, the inspector randomly sampled and tested in Jinyang to check the specifications, data, etc. of the semi-finished product. Ensure that the data of semi-finished products is normal.
Semi-finished trial device
Modular pre-assemblies in factory test areas
Check connector matching and overall structural stability
Final inspection of finished products
100% appearance inspection: surface finish, welding point quality
Functional test: Simulate durability in harsh environments
Check external dimensions, appearance, finishing surface treatments, etc.